Whole-home renovations in Oklahoma City
Several rooms, one plan. We manage the design, trades, permits, and schedule so you're dealing with one team from start to finish.
What we take on
Most whole-home projects combine a few of these.
- Kitchen and bathroom remodels
- Opening up walls and changing layouts
- Flooring throughout the house
- Interior paint, trim, and doors
- Lighting and electrical updates
- Room additions: bedrooms, offices, primary suites
- Exterior updates: siding, windows, and outdoor living
- Design help with our interior design partners
What whole-home projects cost
Every house is different, but these ranges show where most projects land.
Multi-room refresh
$15k–$40k
- 2–3 rooms
- New flooring, paint, and trim
- Lighting and fixture updates
- Same layout
For updating a dated house without moving walls.
Full interior renovation
$60k–$120k+
- Kitchen and one or more baths
- Some layout changes
- Flooring and finishes throughout
- Electrical and plumbing updates
A top-to-bottom update of how the house lives.
Renovation plus addition
$125k+
- New bedroom, office, or primary suite
- Foundation, framing, and roofing
- Tie-in to the existing house
- Permits and inspections
When the house needs more space, not just new finishes.
Older homes often hide outdated wiring, plumbing, or subfloor damage. Plan a 10–15% contingency on top of your range.
How a whole-home project works
Clear steps, written scope, no vague allowances.
- Free
Consultation
We talk through your vision, budget, timeline, and goals, and map out clear next steps.
- Design
Design with our partners
Our trusted design partners create detailed plans and selections tailored to your house.
- About 3 weeks
Estimate and fixed-price contract
A transparent cost-plus estimate, then a fixed-price contract with the full scope and total cost.
- Typically 3–6 months
Build and walkthrough
A detailed schedule, daily oversight, regular updates, and a final walkthrough backed by our one-year workmanship warranty.
Whole-home projects
Real work from the OKC metro.
Common questions
-
Often, yes. We phase the work so you keep a working kitchen or bathroom as long as possible. For larger projects, some families stay elsewhere for part of the build. We'll talk through it at the walkthrough.
-
Most whole-home remodels take 3–6 months. We give you a clear timeline once your design and selections are final, and keep you updated throughout.
-
Yes. We work closely with trusted design partners, independent designers who create detailed plans and selections for your project, and with an architect when a project needs drawings.
-
Yes, where the work requires them, and we schedule the inspections.
-
We tell you right away, show you what we found, propose a solution, and write it up as a change order. Nothing moves forward until you approve it.
-
In installments due at the start of each major stage of construction. That lets us order materials on time and keep trade partners on schedule. Your contract lays out the full payment schedule.
-
Treat Builds manages your project, and the specialized work is done by subcontractors we've personally vetted for craftsmanship, cleanliness, and professionalism. All communication goes through your Treat Builds project contact.
-
Changes are normal. Each one is written up as a change order using the same cost-plus method, so you see exactly how it affects the price and timeline and approve it before work continues.
-
A one-year workmanship warranty covering construction-related issues, plus the manufacturers' warranties on products.
Let's talk through your project
Start with a free planning call. We'll talk through what you want to build, how you'll use the space, and a realistic budget and timeline.