Bathroom Remodeling in OKC
At Treat Builds, we understand that a bathroom isn’t just a functional space — it’s where your day begins and ends. It should feel comfortable, efficient, and thoughtfully designed for your stage of life.
Since 2019, we’ve helped Oklahoma City homeowners transform outdated, cramped, or inefficient bathrooms into custom spaces that improve both daily function and long-term home value. Whether you're looking to upgrade a builder-grade layout, create a more accessible design, or build a spa-inspired retreat, our remodels are tailored to your goals — not rushed through with shortcuts.
Every project is carefully planned, professionally managed, and built with long-term durability in mind.
Designed for Real Homes
We design around how you actually live.
Clear Pricing
Transparent scopes and realistic budgets.
Dedicated Project Management
You’re not left guessing who’s in charge.
Built to Last
No cosmetic-only flip work.
How Much Does a Bathroom Remodel Cost in Oklahoma City?
Most bathroom remodels in the Oklahoma City area fall into three general ranges depending on size, layout changes, and finish level:
Builder Grade Remodel: $12,000 – $18,000
Best For:
Powder bathrooms or hallway bathrooms where the layout stays the same and finishes are functional but budget-conscious.
Typically Includes:
Demolition and haul-off
New prebuilt vanity with standard top
New toilet
Builder-grade lighting and fixtures
Basic floor tile
Basic tub/shower wall tile
Paint
Minor drywall or trim repairs
What Stays the Same:
Existing layout
Minimal plumbing relocation
Limited customization
This level focuses on refreshing the space rather than redesigning it.
Mid-Range Remodel (Most Common): $18,000 – $30,000
Best For:
Hallway bathroomsor small master bathrooms where homeowners want a noticeable upgrade in quality, style, and long-term durability.
Typically Includes:
Demolition and preparation
New tile shower or upgraded bathtub
Custom paint-grade vanity
Custom countertops with sink
Upgraded tile
Upgraded plumbing fixtures
Updated lighting
Improved waterproofing systems
Paint and trim updates
May Include:
Minor layout adjustments
Niche in shower
Frameless Glass
Better storage solutions
This is where most Oklahoma City homeowners land. It provides a strong balance of investment and long-term value.
Full Remodel / Layout Changes: $30,000 – $45,000+
Best For:
Master bathrooms or homeowners wanting to significantly upgrade the layout, comfort, or resale value.
Typically Includes:
Full demolition to framing (as needed)
Custom tile shower with frameless glass
Relocated plumbing or fixtures
Layout reconfiguration
Custom vanity and cabinetry
Higher-end tile and finish selections
Upgraded lighting plan
Detailed trim and finish carpentry
This level allows for full customization and long-term structural upgrades — not just surface improvements.
Your final cost is primarily driven by:
Tile and material selections
Shower vs tub configuration
Layout changes
Plumbing and electrical modifications
Level of finish quality
We don’t believe in vague “starting at” pricing. Our goal is to help you understand realistic ranges early, then dial in exact numbers once your scope and finishes are defined.
How Long Does a Bathroom Remodel Take?
Most of our bathroom remodels take approximately three weeks from demolition to final walkthrough once construction begins.
That timeline allows the work to be done correctly — without rushing critical steps that impact long-term durability.
What a Typical 3-Week Remodel Looks Like
Week 1 – Demo & Rough-In Work
Demolition and haul-off
Plumbing and electrical updates
Framing adjustments (if needed)
Inspection scheduling (if required)
Week 2 – Waterproofing & Tile Installation
Shower waterproofing system installation
Tile work (walls and floors)
Grouting and cure time
Flooring installation
Week 3 – Fixtures & Finish Work
Vanity and cabinet installation
Plumbing fixtures
Lighting and electrical trim-out
Glass installation
Paint and final details
Final walkthrough
Why We Don’t Rush Bathroom Remodels
Certain steps in a remodel simply cannot be rushed without compromising quality.
For example:
Proper installation and testing of waterproofing systems
Tile installation requires staging and skilled labor
Major plumbing and electrical changes must be inspected
When you see companies advertising “3-day bathroom remodels,” they are typically installing pre-manufactured wall systems over existing surfaces — not fully rebuilding the space.
That approach may work for some homeowners, but it’s fundamentally different from a custom remodel designed for long-term durability.
What Can Extend the Timeline?
While three weeks is typical, timelines can extend slightly due to:
Layout changes
Custom cabinetry or specialty materials
Material backorders
Larger master bathroom layouts
We set expectations clearly before work begins so you know what to anticipate.
Our goal isn’t just speed — it’s delivering a bathroom that still looks and performs beautifully 10+ years from now.
Why Some Companies Finish Bathrooms in 3 Days — And Why We Don’t
You’ll see ads promising “3-day bathroom remodels” — and in some cases, those are legitimate cosmetic overlay systems.
Most fast remodels involve:
Acrylic wall panels instead of tile
Pre-manufactured shower systems
Minimal plumbing changes
Little to no structural inspection
These systems can look clean and modern, but they are fundamentally different from a traditional remodel.
Our approach focuses on:
Removing everything down to framing where needed
Inspecting for hidden water damage
Rebuilding with proper waterproofing systems
Custom tile work
Long-term durability
Think of it like this:
3-Day Remodel = Surface Replacement
3-Week Remodel = Structural Upgrade
Neither is “wrong” — but they solve very different problems.
If your goal is longevity, customization, and real value improvement, a three-week build is usually the correct path.
Our Bathroom Remodel Process
A well-executed bathroom remodel isn’t just about finishes — it’s about planning, sequencing, and communication.
Here’s what working with Treat Builds typically looks like:
-
We start by understanding your goals:
What’s not working in your current bathroom?
Are you updating finishes or rethinking layout?
What investment range are you comfortable with?
What timeline are you working toward?
This helps determine whether your project is a cosmetic refresh or a full remodel.
-
If it’s a good fit, we schedule an on-site visit to:
Evaluate existing plumbing and layout
Discuss design direction
Identify potential structural or waterproofing concerns
Establish a realistic budget range
Clear scope at this stage prevents surprises later.
-
Before construction begins, we finalize:
Tile selections
Fixture finishes
Vanity and cabinetry
Lighting
Layout adjustments (if needed)
We prefer decisions to be made upfront so the build phase runs efficiently.
-
Construction typically includes:
Demolition and prep
Rough plumbing and electrical
Waterproofing and tile installation
Fixture installation and finish carpentry
Final walkthrough
We sequence trades intentionally to protect quality and minimize disruption.
-
Before we consider a project complete, we:
Review every finish detail
Address any touch-ups
Ensure fixtures and systems are functioning properly
Our goal is to leave you with a bathroom that feels thoughtfully built — not rushed.
Let’s Help You Get Clear on What’s Possible.
Tell us a little about your bathroom, your goals, and your ideal timeline. Once we review your project details, we’ll reach out with next steps.
We take on a limited number of bathroom remodels at a time to ensure quality and attention to detail.