Bathroom Remodeling in OKC

At Treat Builds, we understand that a bathroom isn’t just a functional space — it’s where your day begins and ends. It should feel comfortable, efficient, and thoughtfully designed for your stage of life.

Since 2019, we’ve helped Oklahoma City homeowners transform outdated, cramped, or inefficient bathrooms into custom spaces that improve both daily function and long-term home value. Whether you're looking to upgrade a builder-grade layout, create a more accessible design, or build a spa-inspired retreat, our remodels are tailored to your goals — not rushed through with shortcuts.

Every project is carefully planned, professionally managed, and built with long-term durability in mind.

Designed for Real Homes
We design around how you actually live.

Clear Pricing
Transparent scopes and realistic budgets.

Dedicated Project Management
You’re not left guessing who’s in charge.

Built to Last
No cosmetic-only flip work.

How Much Does a Bathroom Remodel Cost in Oklahoma City?

Most bathroom remodels in the Oklahoma City area fall into three general ranges depending on size, layout changes, and finish level:

Builder Grade Remodel: $12,000 – $18,000

Best For:
Powder bathrooms or hallway bathrooms where the layout stays the same and finishes are functional but budget-conscious.

Typically Includes:

  • Demolition and haul-off

  • New prebuilt vanity with standard top

  • New toilet

  • Builder-grade lighting and fixtures

  • Basic floor tile

  • Basic tub/shower wall tile

  • Paint

  • Minor drywall or trim repairs

What Stays the Same:

  • Existing layout

  • Minimal plumbing relocation

  • Limited customization

This level focuses on refreshing the space rather than redesigning it.

Mid-Range Remodel (Most Common): $18,000 – $30,000

Best For:
Hallway bathroomsor small master bathrooms where homeowners want a noticeable upgrade in quality, style, and long-term durability.

Typically Includes:

  • Demolition and preparation

  • New tile shower or upgraded bathtub

  • Custom paint-grade vanity

  • Custom countertops with sink

  • Upgraded tile

  • Upgraded plumbing fixtures

  • Updated lighting

  • Improved waterproofing systems

  • Paint and trim updates

May Include:

  • Minor layout adjustments

  • Niche in shower

  • Frameless Glass

  • Better storage solutions

This is where most Oklahoma City homeowners land. It provides a strong balance of investment and long-term value.

Full Remodel / Layout Changes: $30,000 – $45,000+

Best For:
Master bathrooms or homeowners wanting to significantly upgrade the layout, comfort, or resale value.

Typically Includes:

  • Full demolition to framing (as needed)

  • Custom tile shower with frameless glass

  • Relocated plumbing or fixtures

  • Layout reconfiguration

  • Custom vanity and cabinetry

  • Higher-end tile and finish selections

  • Upgraded lighting plan

  • Detailed trim and finish carpentry

This level allows for full customization and long-term structural upgrades — not just surface improvements.

Your final cost is primarily driven by:

  • Tile and material selections

  • Shower vs tub configuration

  • Layout changes

  • Plumbing and electrical modifications

  • Level of finish quality

We don’t believe in vague “starting at” pricing. Our goal is to help you understand realistic ranges early, then dial in exact numbers once your scope and finishes are defined.

How Long Does a Bathroom Remodel Take?

Most of our bathroom remodels take approximately three weeks from demolition to final walkthrough once construction begins.

That timeline allows the work to be done correctly — without rushing critical steps that impact long-term durability.

What a Typical 3-Week Remodel Looks Like

Week 1 – Demo & Rough-In Work

  • Demolition and haul-off

  • Plumbing and electrical updates

  • Framing adjustments (if needed)

  • Inspection scheduling (if required)

Week 2 – Waterproofing & Tile Installation

  • Shower waterproofing system installation

  • Tile work (walls and floors)

  • Grouting and cure time

  • Flooring installation

Week 3 – Fixtures & Finish Work

  • Vanity and cabinet installation

  • Plumbing fixtures

  • Lighting and electrical trim-out

  • Glass installation

  • Paint and final details

  • Final walkthrough

Why We Don’t Rush Bathroom Remodels

Certain steps in a remodel simply cannot be rushed without compromising quality.

For example:

  • Proper installation and testing of waterproofing systems

  • Tile installation requires staging and skilled labor

  • Major plumbing and electrical changes must be inspected

When you see companies advertising “3-day bathroom remodels,” they are typically installing pre-manufactured wall systems over existing surfaces — not fully rebuilding the space.

That approach may work for some homeowners, but it’s fundamentally different from a custom remodel designed for long-term durability.

What Can Extend the Timeline?

While three weeks is typical, timelines can extend slightly due to:

  • Layout changes

  • Custom cabinetry or specialty materials

  • Material backorders

  • Larger master bathroom layouts

We set expectations clearly before work begins so you know what to anticipate.

Our goal isn’t just speed — it’s delivering a bathroom that still looks and performs beautifully 10+ years from now.

Why Some Companies Finish Bathrooms in 3 Days — And Why We Don’t

You’ll see ads promising “3-day bathroom remodels” — and in some cases, those are legitimate cosmetic overlay systems.

Most fast remodels involve:

  • Acrylic wall panels instead of tile

  • Pre-manufactured shower systems

  • Minimal plumbing changes

  • Little to no structural inspection

These systems can look clean and modern, but they are fundamentally different from a traditional remodel.

Our approach focuses on:

  • Removing everything down to framing where needed

  • Inspecting for hidden water damage

  • Rebuilding with proper waterproofing systems

  • Custom tile work

  • Long-term durability

Think of it like this:

3-Day Remodel = Surface Replacement
3-Week Remodel = Structural Upgrade

Neither is “wrong” — but they solve very different problems.

If your goal is longevity, customization, and real value improvement, a three-week build is usually the correct path.

Our Bathroom Remodel Process

A well-executed bathroom remodel isn’t just about finishes — it’s about planning, sequencing, and communication.

Here’s what working with Treat Builds typically looks like:

  • We start by understanding your goals:

    • What’s not working in your current bathroom?

    • Are you updating finishes or rethinking layout?

    • What investment range are you comfortable with?

    • What timeline are you working toward?

    This helps determine whether your project is a cosmetic refresh or a full remodel.

  • If it’s a good fit, we schedule an on-site visit to:

    • Evaluate existing plumbing and layout

    • Discuss design direction

    • Identify potential structural or waterproofing concerns

    • Establish a realistic budget range

    Clear scope at this stage prevents surprises later.

  • Before construction begins, we finalize:

    • Tile selections

    • Fixture finishes

    • Vanity and cabinetry

    • Lighting

    • Layout adjustments (if needed)

    We prefer decisions to be made upfront so the build phase runs efficiently.

  • Construction typically includes:

    • Demolition and prep

    • Rough plumbing and electrical

    • Waterproofing and tile installation

    • Fixture installation and finish carpentry

    • Final walkthrough

    We sequence trades intentionally to protect quality and minimize disruption.

  • Before we consider a project complete, we:

    • Review every finish detail

    • Address any touch-ups

    • Ensure fixtures and systems are functioning properly

    Our goal is to leave you with a bathroom that feels thoughtfully built — not rushed.

Let’s Help You Get Clear on What’s Possible.

Tell us a little about your bathroom, your goals, and your ideal timeline. Once we review your project details, we’ll reach out with next steps.

We take on a limited number of bathroom remodels at a time to ensure quality and attention to detail.